On-Site Heavy Fabrication & Erection
Precision field engineering, tank erection, heavy structural assemblies, and high-pressure piping executed at your plant or project site with ASME Sec IX certified welders and ISO 9001 quality compliance.
50,000+ MT
Total Structural & Tankage Erected
ASME & IBR
Certified Welding & Quality Standards
48-Hour
Rapid Site Team Mobilization
Zero LTI
Stringent Plant HSE Safety Record
Turnkey field fabrication engineered for critical industrial plants
We deploy self-contained mobile fabrication skids, qualified welding procedures (WPS/PQR), and dedicated site supervisors directly to your project location.
Storage Tank & Vessel Erection
Field assembly and full penetration welding of API 650 & API 620 storage tanks, silos, and hoppers up to 5,000 m³ capacity.
Heavy Structural Steel Erection
Erection of heavy industrial trusses, pipe racks, equipment support structures, and furnace superstructures up to 500 MT modules.
Cross-Country & Plant Process Piping
Carbon steel, alloy steel (P11, P22, P91), and austenitic stainless steel process piping under ASME B31.1 & B31.3 standards.
Shutdown & Turnaround Teams
Rapid mobilization of mobile welding skids, orbital TIG machines, and certified trade crews for planned plant turnarounds.
Why leading EPCs & plant owners choose Maple On-Site
Field fabrication requires exceptional safety diligence, certified welding procedures, and reliable turnaround mobilization.
Zero LTI Safety Record
Stringent site HSE management, daily tool-box talks, continuous gas testing, and strict permit-to-work compliance to ensure zero accidents.
ASME & IBR Certified Welders
Every welder deployed holds valid 6G/6GR qualifications under ASME Section IX and IBR with third-party verified Welder Qualification Records (WQR).
48-Hour Rapid Mobilization
Self-contained mobile welding rigs, 125-250 kVA soundproof DG sets, and certified rigging crews ready to mobilize to site within 48 hours.
In-House WPS & PQR Library
Proven library of over 120 qualified welding procedures covering carbon steel, alloy pipes (P11, P22, P91), stainless steel, Inconel, and duplex.
100% Radiographic Quality
Consistent first-time radiography clearance rate exceeding 98.6% across critical petrochemical, refinery, and power piping joints.
Transparent Tonnage Pricing
Definitive milestone billing and itemized per-MT rates with weekly man-hour logging and no surprise escalation clauses.
Technical standards & operational limits
| Engineering Parameter | Maple Field Standard |
|---|---|
| Welding Standards | ASME Section IX, AWS D1.1, IBR, EN ISO 15614-1 |
| Materials Handled | Carbon Steel (A106/A516), Stainless Steel (304/316/321), Inconel, Monel, Duplex |
| NDT Acceptance | 100% Radiographic Testing (RT) / Ultrasonic Testing (UT) / Magnetic Particle (MPI) |
| Site Safety Record | Zero Lost-Time Incidents (LTI) standard, OSHA & Plant HSE Compliance |
| Equipment Mobilization | Mobile DG Sets (125-250 kVA), 6G Welding Inverters, 50T-150T Telescopic Cranes |
| Geographic Coverage | Hazira Belt, Dahej PCPIR, Jamnagar, Mundra, Mumbai, Pan-India Deployment |
Submit your on-site fabrication RFQ
Attach drawings, specifications, tonnage estimates, or site parameters. Our estimating engineers review all requirements under non-disclosure agreements and return an official proposal within 24 hours.
