Back to All Projects
PIPING• Refining & Petrochemical
P91 & Inconel 625 Furnace Revamp Piping Spools
High-alloy pre-fabricated piping spools with precision induction preheating and post-weld heat treatment.
Client: National Oil Corporation
Site: Vadodara, Gujarat
Date: Jun 2025
Project Overview & Execution Details
Critical high-temperature furnace revamping spools fabricated under rigorous metallurgical controls. Welded using GTAW root and hot passes with controlled interpass temperature monitoring and automated electric resistance PWHT.
Defined Scope of Work:
450 pipe spools ranging from 2 inch to 24 inch diameter, including RT, UT, PMI, and hardness testing.
Execution Milestones & QA Gates
Chronological project order tracking
Engineering Drawings & Material Procured
COMPLETEDDelivered on: 16 Oct 2026
Cutting, Fit-up & Root Pass Inspection
COMPLETEDDelivered on: 16 Oct 2026
3
Full Welding & NDT (Radiography / UT)
IN_PROGRESS4
Blasting, Protective Coating & Final QA Handover
PENDINGTechnical Specifications
- Piping Material
- ASTM A335 Grade P91 & Inconel 625
- NDE Standard
- 100% Radiography + 100% Hardness Testing
- Preheat / PWHT
- Induction heating 220°C / PWHT at 750°C