STRUCTURAL• Petrochemical & Refining

2,400 MT Petrochemical Piperack & Structure

Complete off-site fabrication, dimensional inspection, trial assembly, and on-site erection of heavy steel piperacks.

Client: Major Refinery Expansion Project
Site: Hazira, Gujarat
Date: Nov 2025

Project Overview & Execution Details

Manufactured and erected structural steel modules under stringent seismic and wind load design specifications. The project required 100% UT testing on full-penetration butt welds, trial pre-assembly in the workshop to guarantee zero site rework, and phased site erection during operational plant hours.

Defined Scope of Work:

Fabrication of heavy box columns, beams, bracing members, grating, handrails, and hot-dip galvanized walkways.

Execution Milestones & QA Gates

Chronological project order tracking

2 / 4 Completed

Engineering Drawings & Material Procured

COMPLETED

Delivered on: 16 Oct 2026

Cutting, Fit-up & Root Pass Inspection

COMPLETED

Delivered on: 16 Oct 2026

3

Full Welding & NDT (Radiography / UT)

IN_PROGRESS
4

Blasting, Protective Coating & Final QA Handover

PENDING

Technical Specifications

Total Tonnage
2,400 MT
Steel Grade
IS 2062 E350 / E250
Weld Testing
100% Visual, 20% DPT, 100% UT on tension welds
Surface Finish
Sa 2.5 blast clean + Inorganic Zinc + Epoxy MIO + Polyurethane

Request a Proposal for a Similar Project

Connect directly with our engineering estimation desk to discuss material grades, WPS requirements, or fabrication schedules.

Start Your Engineering Engagement

Get an accurate estimation for your project

Request Engineering Quotation (RFQ)

Submit drawings, tonnage specifications, and scope of work for fast technical estimation.

ASME / ISO NDA Protected. Your technical drawings remain confidential.
2,400 MT Petrochemical Piperack & Structure | Maple Engineering Case Study | Maple Heavy Engineering